Product Details:
Payment & Shipping Terms:
|
| Max Product Volume: | 10 L | Number Of Die Heads: | 1, 2, 3, 4 |
|---|---|---|---|
| Screw Diameter: | 80 Mm (L/D 24) | HDPE Plasticizing Capacity: | 90 Kg/h |
| Clamping Force: | 150 KN | Control System: | PLC With Touch Screen |
| Applicable Materials: | PE, PP, PVC, PA | Station: | Double |
| Highlight: | Double Station Extrusion Blow Moulder,80 kW Extrusion Molding Machine,10L Detergent Bottle Blow Moulder |
||
Electrical capacity is a real constraint in established factories. A buyer with a 100 kVA transformer often cannot add a large machine without a substation upgrade, which is why the installed power figure deserves as much attention as clamping force when specifying a line.
The MP80D is installed at 80 kW total, split across 15.85 kW of screw heating, 10 kW of head heating, a 30 kW extrusion motor and an 18.7 kW oil pump. That balance is deliberately chosen so the machine produces at full rate without demanding a supply upgrade in most plants.
Key Features| Parameter | MP80D Specification |
|---|---|
| Applicable materials | PE, PP, PVC, PA |
| Max product volume | 10 L |
| Number of die heads | 1, 2, 3, 4 |
| Clamping force | 150 kN |
| Platen opening stroke | 220 - 620 mm |
| Max mould size (W x H) | 520 x 460 mm |
| Screw diameter | 80 mm |
| Screw L/D ratio | 24 |
| HDPE plasticizing capacity | 90 kg/h |
| Screw heating | 4 zones, 15.85 kW |
| Die head heating | 3 zones, 10 kW |
| Extrusion motor power | 30 kW |
| Oil pump motor power | 18.7 kW |
| Total installed power | 80 kW |
| Cooling water consumption | 40 L/min |
| Compressed air | 1.5 m3/min at 0.6-0.8 MPa |
| Machine weight | 8.2 t |
| Machine dimensions (L x W x H) | 4.0 x 2.3 x 2.5 m |
A: Yes, the standard build is 380V, 50Hz, three phase with 80 kW installed. We ask for your site voltage and frequency at order stage and configure the electrical build accordingly, including 415V or 60Hz where needed.
Q: Why does the heating total differ from the installed power?A: Heating elements cycle on and off once the barrel reaches temperature, so their average draw is far below the rated 25.85 kW. The 80 kW figure is the sum of connected loads, which is what cable and breaker sizing must be based on.
Q: Does low installed power mean lower output?A: No. Output is set by screw geometry and melt capacity, both of which reach 90 kg/h on HDPE. The electrical design simply avoids over-sizing motors and heating, which also reduces running cost.
Packaging, Delivery and Quality AssuranceThe machine ships with ports capped and cabinet sealed with desiccant inside an export wooden case with steel reinforcement and moisture barrier film. Delivery is 25 to 35 working days after deposit. CE certification, ISO9001:2008 records, English electrical drawings, a 12 month warranty and remote commissioning support are included.
Contact Person: Levi.Li
Tel: 86-13396686968
Fax: 86-574-81688011