|
Product Details:
Payment & Shipping Terms:
|
| Max Product Volume: | 10 L | Number Of Die Heads: | 1, 2, 3, 4 |
|---|---|---|---|
| Screw Diameter: | 80 Mm (L/D 24) | HDPE Plasticizing Capacity: | 90 Kg/h |
| Clamping Force: | 150 KN | Control System: | PLC With Touch Screen |
| Applicable Materials: | PE, PP, PVC, PA | Station: | Double |
| Highlight: | PLC touch screen blow molding equipment,double station 10L bottle line,extrusion molding machine |
||
Buying a machine is easy; getting a line that produces saleable bottles from week one is the harder part. The MP80D is supplied as a configured bottle line: machine, control system, matched utility requirements and commissioning support with the buyer's own moulds.
The PLC touch screen is the operator's whole interface to that line. Temperature, extrusion, blow pressure, cooling and clamping all sit on one screen, so a shift handover is a recipe name and a first article check rather than a verbal account of what was changed.
Key Features| Parameter | MP80D Specification |
|---|---|
| Applicable materials | PE, PP, PVC, PA |
| Max product volume | 10 L |
| Number of die heads | 1, 2, 3, 4 |
| Clamping force | 150 kN |
| Platen opening stroke | 220 - 620 mm |
| Max mould size (W x H) | 520 x 460 mm |
| Screw diameter | 80 mm |
| Screw L/D ratio | 24 |
| HDPE plasticizing capacity | 90 kg/h |
| Screw heating | 4 zones, 15.85 kW |
| Die head heating | 3 zones, 10 kW |
| Extrusion motor power | 30 kW |
| Oil pump motor power | 18.7 kW |
| Total installed power | 80 kW |
| Cooling water consumption | 40 L/min |
| Compressed air | 1.5 m3/min at 0.6-0.8 MPa |
| Machine weight | 8.2 t |
| Machine dimensions (L x W x H) | 4.0 x 2.3 x 2.5 m |
A: A chiller delivering 40 litres per minute of cooling water, a compressor supplying 1.5 cubic metres per minute at 0.6 to 0.8 MPa, and a 380V three phase supply rated for the 80 kW installed load. We send a site preparation sheet with the order confirmation.
Q: How long does commissioning take?A: Mechanical installation on a prepared floor usually takes two to three days, and commissioning with your moulds another two to three including wall thickness tuning. We plan five to six working days from arrival to first approved bottle.
Q: Is operator training included?A: Yes. Training covers daily operation, recipe recall, first article checks and basic fault reading on the PLC. It is delivered during commissioning, with an English manual left on site.
Packaging, Delivery and Quality AssuranceThe machine and control cabinet are packed separately with desiccant and shock indicators, secured in an export wooden case with steel reinforcement. Delivery is 25 to 35 working days after deposit. CE certification, ISO9001:2008 records, 12 month warranty, commissioning and operator training are included.
Contact Person: Levi.Li
Tel: 86-13396686968
Fax: 86-574-81688011