|
Product Details:
Payment & Shipping Terms:
|
| Screw Diameter: | 80 Mm | Screw L/D Ratio: | 25:1 |
|---|---|---|---|
| Max Product Volume: | 100 L | Clamping Force: | 180 KN |
| Die Head Configuration: | Single / Double / Four | Mould Platen Size: | 800 X 600 Mm |
| Extrusion Capacity: | 120-150 Kg/h (HDPE) | Control System: | PLC With Color Touch Screen |
| Highlight: | Extrusion Blow Molding Machine 30-Minute Changeover,Quick Mold Change Extrusion Blow Molding Machine,Extrusion Blow Molding Machine Quick Mold Change |
||
Changeover time is the hidden capacity of any blow molding plant. A machine that needs half a day to swap a mould loses a shift every time the order book changes, and buyers with mixed container sizes end up quoting longer lead times than their competitors.
The MP100FD uses a quick clamping system with stored recipes, so a mould change from a 100 litre drum to a 20 litre jerry can is typically completed in under 30 minutes by two people, including the first article weight check.
Key Features| Parameter | MP100FD Specification |
|---|---|
| Screw diameter | 80 mm |
| Screw L/D ratio | 25:1 |
| HDPE extrusion capacity | 120 - 150 kg/h |
| Max product volume | 100 L |
| Clamping force | 180 kN |
| Die head configuration | Single / Double / Four |
| Mould platen size (W x H) | 800 x 600 mm |
| Mould thickness range | 150 - 350 mm |
| Mould opening stroke | 400 - 800 mm |
| Heating zones | 4 - 6 |
| Installed power | Approx. 55 kW |
| Oil tank capacity | 350 L |
| Machine weight | Approx. 8,000 kg |
| Machine dimensions (L x W x H) | 4,500 x 2,200 x 3,500 mm |
| Power supply | 380V / 50Hz / 3-phase |
A: Mould out, mould in, clamping, recipe recall, temperature stabilisation start and first article weight check. Large moulds with heavy cores can take longer, which is why we time the changeover with your tooling during commissioning and record the real figure.
Q: Do I need extra equipment for fast changeover?A: A mould cart at platen height and a hoist are the practical essentials. We specify the trolley with the machine so moulds are not manhandled, which is both faster and safer.
Q: Are third party moulds compatible?A: Platen mounting and locating follow common industry patterns, and we review drawings of existing moulds before order so any adaptor plate is quoted up front rather than discovered at installation.
Packaging, Delivery and Quality AssuranceThe machine ships in a fumigation-free export wooden case with steel reinforcement and VCI anti-rust film, with the quick clamp components individually protected. Delivery is 30 to 45 working days after deposit. ISO 9001:2015 and CE certification, 48 hour pre-delivery run, 12 month warranty and documented changeover training are included.
Contact Person: Levi.Li
Tel: 86-13396686968
Fax: 86-574-81688011